15KW Hybrid System for Base Station

The 15KW hybrid system for base station takes solar powering and wind powering hybrid forms, securing electricity supply of the station under grid cut-off.

▉ Project Info

Project Time: 2012

Project Location: Inner Mongolia

Project Capacity: 15KW

Solar Module: Mono 200Wp*36, Poly 150Wp*36

Wind Turbine: 1KW*2

Battery: 96KWH

36KW EMS Powering

The EMS(environmental monitor station) solar powering project consists of 18 sites, each of which takes 1980W solar modules and 9.6KWH gel batteries to support station electricity consumption.

▉ Project Info

Project Time: 2017

Project Location: Inner Mongolia

Project Capacity: 36KW

Solar Module: Poly 330Wp*6*18

Inverter: 2KW off-grid *18

Battery: 12V/200AH*4*18

25KW Border Defence Powering

25KW border defence powering system, consisting of 40pcs of 550Wp solar modules, 25KW inversion&controlling and 48pcs of 2V/1000AH gel batteries, securing defence electricity supply.

▉ Project Info

Time: 2024

Location: Inner Mongolia

Capacity: 25KW

Module: Mono 550Wp*40*18

Inverter: 25KW

Battery: 96KWH

Geophysical Institute Station Powering

The geophysical institute solar powering station project consists of 8 sites, each of which contains 3pcs/2pcs mono 160W solar modules and 4pcs of 12V/50AH gen batteries.

▉ Project Info

Project Time: 2015

Project Location: Beijing

Project Capacity: 3680W

Solar Module: Mono 160Wp*23

Controller: MPPT

Battery: 2.4KWH*8